20. Continuous supervision is required for the operation of the following installations:(a) multiple installations for which total capacity exceeds the maximum capacity established for non-continuous supervision in Schedule C;
(b) mixed installations that, according to section 9, require continuous supervision; and
(c) installations not protected by the protective devices provided for in section 10, with the exception of installations subject to a conditional supervision.