7. A professional technologist must report back to the engineer who, as the case may be, is responsible for supervising or inspecting the work, or for conducting tests where the professional technologist has noted non-compliance with the supervision, inspection or test plan, or an unforeseen element that may result in a modification of the original design of the work.