3.3. The rate per cubic metre of timber used to establish the contribution prescribed in sections 3.1 and 3.2 payable by holders of wood processing plant operating permits is set at $0.71.
Despite the foregoing, the rate in the first paragraph is set at $0 per cubic meter of timber for the period from 1 January 2007 to 31 March 2013.
O.C. 454-2005, s. 4; O.C. 1205-2005, s. 2; O.C. 1188-2006, s. 2; O.C. 536-2009, s. 2; O.C. 181-2010, s. 2; O.C. 276-2011, s. 2; O.C. 220-2012, s. 2.