16. Any lump sum charged must be negotiated between the owner and the firm engaged. The sum shall be estimated on the basis of the number of hours considered necessary for carrying out the task on the basis of the rates chargeable by the hour, or on the basis of the percentage of the cost of the works or the budget.
O.C. 2402-84, s. 16; O.C. 196-2023.