56.13. A construction work guarantor referred to in this Chapter is responsible for sending to the Board, through the electronic system set up by the Board, a statement of continuing education together with a copy of the participation certificates issued by the trainers not later than 31 March from the end of each reference period.
However, where the licence includes any of licence subclasses 15.1, 15.2, 15.3, 15.4 and 15.5, the construction work guarantor referred to in this Chapter must send the documents required under the first paragraph to the Corporation of Master Pipe-Mechanics of Québec, constituted under the Master Pipe-Mechanics Act (chapter M-4) or, where the licence includes subclass 16, to the Corporation of Master Electricians of Québec, constituted under the Master Electricians Act (chapter M-3), through the electronic system set up or used by those corporations. Where the licence includes any of subclasses, 15.1, 15.2, 15.3, 15.4 and 15.5 and subclass 16 simultaneously, the guarantor must then send the documents referred to in the first paragraph to the corporation which, as designated by the building contractor for which the guarantor acts, is responsible for the contractor’s professional qualification.
514-2020O.C. 514-2020, s. 21.