183.Siting of an aboveground tank must meet the requirements of section 8.48 of Chapter VIII of the Construction Code (chapter B-1.1, r. 2) with the references in Table 2 of that section to sections 8.60 and 8.61 replaced by references to sections 188 and 189 of this Chapter respectively.