119.2. The Board approves a quality control program where the following conditions are met:(1) in the case of high-risk petroleum equipment other than a pipeline, the program consists of a process for the verification of the conformity of high-risk petroleum equipment that provides quality and safety at least equivalent to that sought by paragraph 2 of section 117 and, according to the type of equipment, by paragraph 3, 4 or 5 of that section;
(1.1) in the case of a pipeline, the program meets the applicable requirements of CAN/CSA Standard Z662, Oil and Gas Pipeline Systems, published by the CSA Group;
(2) the owner undertakes to implement the program as soon as it is approved, and to send to the Board each year a management report and a register of the inspections carried out to ensure that implementation;
(3) the person in charge of the program and the verification of the conformity of high-risk petroleum equipment(a) carries on professional activities related to the inspection, monitoring or design of petroleum equipment installations;
(b) is an engineer who is a member of the Ordre des ingénieurs du Québec or a professional technologist who holds a licence issued by the Ordre des technologues professionnels du Québec;
(c) has sufficient independence to determine the problems related to quality control, and apply the required solutions;
(4) except in the case of a pipeline, the owner holds a permit for the use of high-risk petroleum equipment covered by the program, issued by the Board;
(5) the owner pays to the Board the fee payable under section 130.1.