I-0.2.1, r. 4 - Regulation respecting the weighting applicable to the selection of foreign nationals

Full text
Revoked on 29 November 2024
This document has official status.
chapter I-0.2.1, r. 4
Regulation respecting the weighting applicable to the selection of foreign nationals
Québec Immigration Act
(chapter I-0.2.1, ss. 27 and 104).
Revoked, M.O. 2023-002, 2023 G.O. 2, 2763; eff. 2024-11-29.
Despite the foregoing, this Regulation continues to have effect insofar as it is necessary for the purposes of sections 118, 118.8, 118.9 and 118.12 to 118.14 of the Québec Immigration Regulation (chapter I-0.2.1, r. 3).
1. The weighting of the factors and criteria in the Selection Grid for the Economic Class in Schedule A to the Québec Immigration Regulation (chapter I-0.2.1, r. 3), the cutoff scores for certain factors or criteria and the passing scores for all factors that apply to a foreign national, with or without an accompanying spouse or de facto spouse, who applies for a selection certificate are, per class of immigrants, those provided for in Schedules A to E.
M.O. 2018-008, s. 1.
2. This Regulation replaces the Regulation respecting the weighting applicable to the selection of foreign nationals (chapter I-0.2, r. 2).
M.O. 2018-008, s. 2.
3. (Omitted).
M.O. 2018-008, s. 3.
SCHEDULE A
(s. 1)
REGULAR SKILLED WORKER PROGRAM
  
M.O. 2018-008, Sch. A; I.N. 2023-12-12.
SCHEDULE B
(s. 1)
INVESTOR PROGRAM
  
M.O. 2018-008, Sch. B; M.O. 2021-006, s. 1; I.N. 2023-12-12.
SCHEDULE C
(s. 1)
ENTREPRENEUR PROGRAM – COMPONENT 1
  
M.O. 2018-008, Sch. C; M.O. 2021-006, s. 2; I.N. 2023-12-12.
SCHEDULE D
(s. 1)
ENTREPRENEUR PROGRAM – COMPONENT 2
  
M.O. 2018-008, Sch. D; M.O. 2021-006, s. 3; I.N. 2023-12-12.
SCHEDULE E
(s. 1)
SELF-EMPLOYED WORKERS PROGRAM
  
M.O. 2018-008, Sch. E; M.O. 2021-006, s. 4; I.N. 2023-12-12.
TRANSITIONAL
2021
(M.O. 2021-006) SECTION 5. The amendment provided for in paragraph 2 of section 3 of this Regulation applies to the application for selection for permanent immigration filed under the entrepreneur program before 1 November 2020 for which no final decision had been rendered on that date.
REFERENCES
M.O. 2018-008, 2018 G.O. 2, 3354
M.O. 2021-006, 2021 G.O. 2, 1182