Home
Contact us
Site map
Québec.ca
FAQ
Français
Ministère de l'Emploi et de la Solidarité sociale
Advanced search
Consolidated Statutes and Regulations
Consolidated Statutes
Consolidated Regulations
Annual Statutes and Regulations
Annual Statutes
Annual Regulations
Additional information
Québec Official Publisher
What’s new?
Information note
Policy of the Minister of Justice
Laws: Amendments
Laws: Provisions not in force
Laws: Provisions brought into force
Annual Statutes: PDF versions since 1996
Regulations: Amendments
Annual Regulations: PDF versions since 1996
Court Decisions
M-11.6, r. 2
- Regulation respecting the rate to determine the costs of sampling, analysis, inspection or investigation included in the costs of civil or penal proceedings instituted for the purposes of the Act respecting certain measures enabling the enforcement of environmental and dam safety legislation
Table of contents
Occurrences
0
Current Version
Full text
Updated to 1 January 2015
This document has official status.
chapter
Q-2, r. 47
Regulation respecting the rate to determine the costs of sampling, analysis, inspection or investigation included in the costs of civil or penal proceedings instituted for the purposes of the Environment Quality Act
ENVIRONMENT QUALITY — INSPECTION — CIVIL — PENAL
Environment Quality Act
(chapter Q-2, s. 116.1.1)
.
Q-2
01
January
01
1
2015
The rates prescribed in the Regulation have been indexed as of 1 January 2015 pursuant to the notice published in Part 1 (French) of the Gazette officielle du Québec of 6 December 2014, page 1198. (s. 3, Sch. I)
1
.
The costs incurred by the Minister of Sustainable Development, Environment and Parks includes the costs related to the use of the personnel and equipment of the Ministère du Développement durable, de l’Environnement et des Parcs and, if any, the costs related to the use of external human or material resources.
M.O. 2005-10-11, s. 1
.
2
.
The rate for departmental labour and special equipment is established in Schedule I.
M.O. 2005-10-11, s. 2
.
3
.
Despite section 2, the rate for a laboratory analysis made by the Department is established on the basis of the time required for the analysis at an hourly rate of
$117.08
, including manpower and equipment.
M.O. 2005-10-11, s. 3
.
4
.
The rate for external human and material resources corresponds to the actual costs incurred by the Minister.
M.O. 2005-10-11, s. 4
.
5
.
The costs established in section 3 and in Schedule I to this Regulation are adjusted on 1 January of each year based on the percentage change in the Consumer Price Indexes for Canada, as published by Statistics Canada; the change is calculated by determining the difference between the average of the monthly indexes for the 12-month period ending on 30 September of the preceding year and the average of the monthly indexes for the equivalent period of the second preceding year.
The Minister is to publish the results of the adjustment in the
Gazette officielle du Québec
before 1 January of each year and, if the Minister considers it appropriate, by any other means.
M.O. 2005-10-11, s. 5
.
6
.
(Omitted).
M.O. 2005-10-11, s. 6
.
SCHEDULE I
(
ss. 2 and 5
)
RATE FOR THE RESOURCES OF THE MINISTÈRE DU DÉVELOPPEMENT DURABLE, DE L’ENVIRONNEMENT ET DES PARCS
Rate
___________________________________________________________
ITEMS COSTS
___________________________________________________________
Labour
$ / hour
$ / quarter of an hour
___________________________________________________________
Public servant - technician $46.82*
$11.71*
___________________________________________________________
Professional or engineer $70.27*
$17.57*
___________________________________________________________
Executive $87.81
$21.94
___________________________________________________________
Special equipment $ / day or part of day
of use
___________________________________________________________
Nitrites and nitrates analyzer $936.72
___________________________________________________________
Flame thermocouple detector $35.11
___________________________________________________________
Photo-ionization detector $40.98
___________________________________________________________
Gas detector $23.41
___________________________________________________________
Automatic sampler $117.08
___________________________________________________________
Flow measurement equipment $228.34
___________________________________________________________
Gas-powered portable drill $234.17
___________________________________________________________
Generator $158.07
___________________________________________________________
Mobile laboratory - LEAE $1,463.64
(environmental analysis)
___________________________________________________________
Mobile laboratory - LMP (multi-purpose) $2,561.81
___________________________________________________________
Mobile laboratory - TAGA $11,006.61
(trace atmospheric gas analyzer)
___________________________________________________________
Water pump $158.07
___________________________________________________________
Air sampler pump $163.94
___________________________________________________________
Electric peristaltic pump $234.17
___________________________________________________________
Submersible pump $439.08
___________________________________________________________
Waterra pump $210.77
___________________________________________________________
Mobile coordination unit $1,328.98
___________________________________________________________
Seismograph $626.45
___________________________________________________________
Water level sensors $17.57
___________________________________________________________
Interface sensors $17.57
___________________________________________________________
Type I sonometer $52.68
___________________________________________________________
Type II sonometer $17.57
___________________________________________________________
Blower $23.41
___________________________________________________________
Portable radioactivity spectrometer $427.40
___________________________________________________________
Water oxidation evaluation station $40.98
___________________________________________________________
Total survey station (including software) $40.98
___________________________________________________________
Meteorological tower $310.30
___________________________________________________________
Safety harness, lifeline and tripod $76.11
___________________________________________________________
Radioactivity measurement kit $503.48
___________________________________________________________
Turbidimeter $58.56
___________________________________________________________
Mobile sampling unit $393.28
___________________________________________________________
*
Under the collective agreements in force, the tariff is increased by 50% if a member of the personnel of the Ministère du Développement durable, de l’Environnement et des Parcs works in excess of normal weekly working hours.
M.O. 2005-10-11, Sch. I
.
REFERENCES
M.O. 2005-10-11, 2005 G.O. 2, 4693
Copy
Select this element
Select parent element
Unselect all
Copy to Drafting
Copy to LAW
Copy to Clipboard
×
To copy : Ctrl+C
0
Contact us
Site map
Québec.ca
Accessibility
Privacy policy
© Gouvernement du Québec
Selections
×
Show
Selections in current document
All selections in the collection
Selected elements
Delete all selections
Show selections
Cyberlex
×
Version 2.2.2.0