R-1.01 - Act ending exploration for petroleum and underground reservoirs and production of petroleum and brine

Full text
12. Holders of a revoked licence must send to the Minister, at the Minister’s request and within the time and in the manner determined by the Minister, the following items:
(1)  the results of cement tests carried out in a laboratory in compliance with the Industry Recommended Practice, IRP #: 25, Primary Cementing, published by the Drilling and Completions Committee;
(2)  any information, documents or samples of a geological or geophysical nature or relating to drilling; and
(3)  any information, documents or samples the Minister considers necessary for the purposes of this Act.
2022, c. 10, s. 1.
In force: 2022-08-23
12. Holders of a revoked licence must send to the Minister, at the Minister’s request and within the time and in the manner determined by the Minister, the following items:
(1)  the results of cement tests carried out in a laboratory in compliance with the Industry Recommended Practice, IRP #: 25, Primary Cementing, published by the Drilling and Completions Committee;
(2)  any information, documents or samples of a geological or geophysical nature or relating to drilling; and
(3)  any information, documents or samples the Minister considers necessary for the purposes of this Act.
2022, c. 10, s. 1.