Q-2, r. 35.2 - Water Withdrawal and Protection Regulation

Full text
36. (Revoked).
O.C. 696-2014, s. 36; O.C. 871-2020, s. 13.
36. The person responsible for the stratigraphic survey must send to the Minister, within 30 days after the plugging of the stratigraphic survey hole is completed, a report signed by the professional who supervised the plugging work. The report must contain the following information:
(1)  the characteristics of the survey hole;
(2)  the stratigraphic profile, indicating in particular the geological formations plugged;
(3)  the plugging technique used;
(4)  the plugging materials used;
(5)  if applicable, the problems that arose during the survey or the plugging work and the measures taken to correct the situation.
O.C. 696-2014, s. 36.