P-6 - Lightning Rods Act

Full text
11. Every maker and every agent who installs or causes to be installed a lightning rod in Québec must, within fifteen days of such installation, transmit to the Minister, by registered or certified letter, a notification setting forth the date and place of installation, the number of aerial points contained therein and the name in full of the person for whom such installation was made.
R. S. 1964, c. 158, s. 11; 1975, c. 83, s. 84.