2115. The contractor is liable for loss of the work occurring before its delivery, unless it is due to the fault of the client or the client is in default for not receiving the work.
However, where the property is supplied by the client, the contractor is not liable for the loss of the work unless it is due to his fault or some other failure on his part. He may not claim the price of his work except where the loss of the work results from an inherent defect in the property supplied or a defect in the property that he was unable to detect, or where the loss is due to the fault of the client.
1991, c. 64, a. 2115; I.N. 2014-05-01; I.N. 2015-11-01.