2025. The charterer shall load and discharge the cargo within the time allowed by the contract or, failing such a stipulation, within a reasonable period or according to the custom of the port.
Where the periods for loading and discharging are fixed separately by the contract, they are not interchangeable and the time used for each operation is computed separately.