18. The residual materials must be conditioned to a maximum particle size of(1) 300 mm in the case of roadway backfilling, except for work undertaken to stabilize a slope in a structure or build a noise-abatement wall, in which case the maximum particle size is determined in the plans and specifications signed and sealed by an engineer; and
(2) 112 mm in other cases.