M-13.1 - Mining Act

Full text
80. The work performed in respect of a claim during the 24 months preceding the current term may, in a report, be applied to the current term of the claim.
However, where a claim obtained by staking is converted into one or more map designated claims following an application under section 83.2, only the work performed in respect of the claim during the 24 months preceding the date of conversion may be applied, in a report, to the term of the claim that follows the conversion.
1987, c. 64, s. 80; 1988, c. 9, s. 23; 1990, c. 36, s. 2; 1998, c. 24, s. 41.
80. The work performed in respect of a claim during the term preceding the current term, excluding property examination, stripping, excavation or technical assessment work may, in a report, be applied to the current term of a claim.
1987, c. 64, s. 80; 1988, c. 9, s. 23; 1990, c. 36, s. 2.
80. The work performed in respect of a claim during the term preceding the current term, excluding property examination, stripping, excavation or technical assessment work may, in a report, be applied to the current term of a claim, at half value.
Notwithstanding the first paragraph, the work performed during the sixty days before the expiry of the term preceding the current term may be applied at full value.
1987, c. 64, s. 80; 1988, c. 9, s. 23.