C-14 - Railway Act

Full text
108. Whenever any gravel, stone, earth, sand or water is taken at a distance from the line of the railway, the company may lay down the necessary sidings, waterpipes or conduits and tracks over or through any lands intervening between the railway and the lands on which such materials or water is found, whatever the distance may be.
R. S. 1964, c. 290, s. 114.