B-1.1 - Building Act

Full text
119. The Board may require that an electricity or piped gas distribution undertaking obtain its consent before connecting an electrical installation or an installation intended to use gas to the distribution network.
1985, c. 34, s. 119; 1991, c. 74, s. 168; 2005, c. 10, s. 66.
119. The Board may require that an electricity or piped gas undertaking obtain its consent before connecting an electric or gas installation to the distribution network.
1985, c. 34, s. 119; 1991, c. 74, s. 168.