Q-2, r. 35.2 - Water Withdrawal and Protection Regulation

Full text
36. The person responsible for the stratigraphic survey must send to the Minister, within 30 days after the plugging of the stratigraphic survey hole is completed, a report signed by the professional who supervised the plugging work. The report must contain the following information:
(1)  the characteristics of the survey hole;
(2)  the stratigraphic profile, indicating in particular the geological formations plugged;
(3)  the plugging technique used;
(4)  the plugging materials used;
(5)  if applicable, the problems that arose during the survey or the plugging work and the measures taken to correct the situation.
O.C. 696-2014, s. 36.