Q-2, r. 27 - Regulation respecting pulp and paper mills

Full text
64. The operator must inspect on a monthly basis the primary element and on a weekly basis the secondary element of each flow measurement system. The operator must keep a log of the inspections and repairs performed and retain it for a minimum of 2 years after the date of the inspection.
O.C. 808-2007, s. 64.